You do not have Javascript enabled. Please email registrar@islandops.org to register manually.

Island Ops Logo
Header

Howard Dwyer's Island Central

Event
Type When Spots
Op Session  4/29 8:00am to 12:00pm 7 spots

ICRR has an urban setting during the steam to diesel transition era. Most switching is performed by diesel road switchers. Operating session jobs include main line , coal hauling, yard operations, and limited branch line runs. The ICRR is freelanced and 100% scenicked. The layout is NCE DCC equipped. The ICRR was featured in the May 2012 edition of Model Railroader. A track plan of the layout is included in the article.

The layout has been expanded and improved since the Model Railroader article appeared.

Handicap Accessibility: Not Handicapped Accessible

Trackplan Bauer Brewing District
Clarenceville Mill St
morris park port richmond
east utica Tenement Incident
   
Track
Webmaster 2023-08-17 14:04